Client: MLM Group

Following appointment Amber undertook the Enabling and CAT B installations for the increased footprint of the existing London headquarters of MLM Group (part of Sweco).

Our scope included pre-construction design to obtain the necessary licence to alter, the strip out of the CAT A & B elements, followed by the installation of the new CAT B fitout works. The CAT B scope included modifications to the MEP system, the installation of the new office, break out space and reception area along with the introduction of flexible working areas including bespoke furniture. All works were undertaken in an occupied live office environment.

Sector: Engineering, Environmental and Building Control
Duration: Phase 1 – 8 weeks, Phase 2 – 5.5 weeks
Size: 16,500 sq ft
Project: CAT B

Location

Client: MLM Group

Following appointment Amber undertook the Enabling and CAT B installations for the increased footprint of the existing London headquarters of MLM Group (part of Sweco).

Our scope included pre-construction design to obtain the necessary licence to alter, the strip out of the CAT A & B elements, followed by the installation of the new CAT B fitout works. The CAT B scope included modifications to the MEP system, the installation of the new office, break out space and reception area along with the introduction of flexible working areas including bespoke furniture. All works were undertaken in an occupied live office environment.

Sector: Engineering, Environmental and Building Control
Duration: Phase 1 – 8 weeks, Phase 2 – 5.5 weeks
Size: 16,500 sq ft
Project: CAT B

Location